Translate:
Location: Basra December 15 , 2013.
The scope of this project to make survey, put final design, procurement's, engineering, hardware assembly, software development, commissioning, SAT, and startup of an industrial " SCADA System ".
The new system shall be complete with all necessary hardware, software, communication, logic application , and operator interface.
The scope of work shall also include replacement and rehabilitation of the existing field devices and instrument to be compatible with the new system.
Location: Al-diwanya June 25, 2009.
The project has a production capacity of 44000 thousand square meters per day. It consists of two sedimentation basins, ten refineries and a ground tank capacity of 6000 cubic meters. It added that the project includes two buildings for withdrawal and payment, and the deposition of clay and chemicals, in addition to three automatic tanks.
It pointed out that the total cost of the project amounted to (36) billion dinars within the investment budget of the ministry, saying that it will help eliminate the scarcity of drinking water in those Areas.
Location: Baghdad Internatioal Airport.
Capacity: 200 m3/s.March 10, 2007.
The normal discharge station (200) m3 / s will pull down the downstream water and raise it to a height of 5 m to allow the new flow of water to flow freely through the siphon running below the bottom of the Euphrates River and then to the southern stream of the general estuary to discharge water to the Gulf Arab border across the Shatt Al-Basra.
The station also works to achieve the design levels of the public downstream water at the station head to the level that allows most of the main sewer networks to discharge the water to the public estuary freely without the need for pumping stations.
Our Teams executed many projects related with airports here under there are some projects we did previously:
Notable Projects:-
Preparation of study, design and implementation of sewage treatment plants project with rain and heavy sewage network main and subsidiary with lifting stations in the centre of Kirkuk province with the processing, implementation, operation and maintenance of the first phase of the project in a turnkey manner.
01/15
Copyright © 2003 - 2020 Den Land CO LL - All Rights Reserved.
Powered by GoDaddy Website Builder